Please Wait...

RSS FeedKD Analytical News

KD Analytical News is moving and expanding! Check out the new KD Analytical CBRNE Blog for news, views, tips and technology.

2/24/2012

Gov. Beshear Announces KD Analytical to Add 15 Jobs, Expand Facility in Lexington

Expansion to triple facility size and double number of employees, represents nearly $900,000 investment.

2/23/2012

KD Analytical assists Puget Sound Clean Air Agency in the evaluation of portable, field-operated GC/MS instrument for air emission testing.

In June 2011, KD Analytical consulted with the Puget Sound Clean Air Agency (PSCAA) in a field demonstration of a portable Gas Chromatography/Mass Spectrometry (GC/MS) unit for air analysis. The main purpose of the sample collection and analysis was to demonstrate the technology for VOC speciation for air surveys.

2/21/2012

JDOERS - Joint Domestic Operations Equipment Requirements Conference

KD Analytical will display at the Joint Domestic Operations Equipment Requirements/DOMOPS Industry Day Exhibition on February 21-22, 2012 in Baltimore, MD.

11/28/2011

HyGie-Tech USA and KD Analytical Announce Partnership

HyGie-Tech USA and KD Analytical Announce Partnership to Introduce HG_Flow Simulation and Modeling Software to US Critical Infrastructure and Bio-Chem Research Markets

5/26/2011

Introducing ReadiTrak 4.0

KD Analytical announces the launch of ReadiTrak 4.0, a greatly enhanced version of its web-based asset readiness management application.

5/12/2011

KD Analytical announces a new job opportunity for an Analytical Scientist

KD Analytical announces a new job opportunity for an Analytical Scientist.

1/12/2011

KD Analytical announces deployment of TekTrak™ Version 3.1

Version 3.1 of TekTrak™ Critical Asset Manager provides new customized dashboards, new tools for scientists, and enhanced equipment management capabilities.

For more information on TekTrak™, visit the KD Analytical TekTrak introduction.

10/25/2010

Project Deepwater Horizon

KD Analytical Consulting, Inc. (KD) was contacted by the National Oceanic and Atmospheric Administration (NOAA) in cooperation with British Petroleum (BP) to do analysis of subsurface sea water for indications of oil in the Gulf of Mexico near the Deepwater Horizon oil leak.

10/7/2010

KD Analytical announces deployment of TekTrak™ Version 2.7

Version 2.7 of TekTrak™ provides a range of feature enhancements and new functionality that will benefit users, executives, and scientists.

10/7/2010

KD Analytical announces new CBRNE Training and Support Office

9/20/2010

Dan Schenk of KD Analytical gets a sample water from the Gulf of Mexico ready to test on board the NOAA Ship Pisces

Dan Schenk of KD Analytical gets a sample water from the Gulf of Mexico ready to test on board the NOAA Ship Pisces about 9 miles south of the Deepwater Horizon oil wellhead near the coast of Louisiana Friday, Aug. 20, 2010. The ship's mission is to test the water around the Deepwater Horizon oil wellhead for signs of hydrocarbons in the water.

10/9/2009

Introducing TekTrak™ CBRNE Equipment Management and Support

A successful response to an emergency requires that the equipment is operational and ready to go.  Most teams have equipment from a wide range of manufacturers requiring calibration and preventative maintenance procedures. It is difficult to efficiently manage and monitor the status of this equipment. In response to these needs, KD is excited to announce the development of TekTrak™.  This web based tool will allow users and managers to quickly and efficiently manage, view the status and get support for their CBRNE equipment regardless of the manufacturer and across multiple locations.

<< 2 of 2 >>

© 2016 KD Analytical Consulting, LLC by Federal Resources | Site Map | Contact Us